Auburn bridge work causes delays from Mass Pike

AUBURN, MA (WHDH) - An offramp on the Mass Pike was shut down Monday in Auburn so crews could perform emergency bridge work.

Officials said part of the bridge came loose Monday. Crews will be working through the night to repair the damage.

Exit 10 on the Mass Pike was shut down heading onto the eastbound side of I-290.

(Copyright (c) 2016 Sunbeam Television. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed.)


blog comments powered by Disqus