BOURNE, MASS. (WHDH) - All four lanes on the Bourne Bridge are back open.
Two of the lanes had been blocked off for repairs.
Steel joints that were damaged by snow plowing had to be fixed; the bridge was also repaved.
(Copyright (c) 2026 Sunbeam Television. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed.)